From:                              route@monster.com

Sent:                               Friday, August 19, 2016 10:52 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Thomas Smith 

Last updated:  06/09/16

Job Title:  no specified

Company:  Apeiron, Inc.

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Cocoa, FL  32927
US

Mobile: 407-730-0373   
growlingator70@yahoo.com

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Thomas Smith - Master Scheduler

Resume Value: jud8cccyvj5fk5aq   

  

 



THOMAS J. SMITH Page 4

___________________________________________________________________________________________________

 

PROFESSIONAL EXPERIENCE  (cont.)

 

UNIVERSAL STUDIOS FLORIDA, INFRASTRUCTURES GROUP, Orlando, FL  1996 - 1998

Senior Project Planner / Scheduler

Oversaw PCL’s construction schedule for the South Parking Garages. This consisted of two 10,000-space parking garages; the first parking garage was pre-cast configuration and the South Parking Garage was a Form/ Pour job.

•Reviewed Griener Engineering’s scheduling submission on a monthly basis, reporting progress to the upper management of Greiner’s subcontractor, Hubbard Construction. Their work consisted of new overpass entrances from International Drive and over I-4 to the theme park (the development of Universal Blvd.) and the modification of the Sand Lake Road re-configuration.

•Subsequently transferred to the Islands of Adventure (I.O.A.) theme park as the Senior Scheduler. Oversaw the submission of all baseline schedules on a month-to-month basis during the construction of Jurassic Park, Lost Continent and Toon Lagoon.

•Directly involved with all impact delays and slippages to the schedules and prepared forensic scheduling evidence to mitigate any work claims throughout the construction process.

•Scheduling duties (see above section; Cost and Scheduling Experience and Duties).

 

HANSCOMB ASSOCIATES, INC., Maitland, FL1995 - 1996

Senior Project Scheduler

•Developed the Design Schedule for VOA & Associates architectural firm for the Port of Entry project at Universal Studios Florida.

•Developed the Design Schedule for Spillis/Candelia architectural firm for the Super Heroes Island of Adventure at Universal Studios Florida.

•Contracted by HOK, the architectural firm that designed and represented the Federal Courts during the construction of the Tampa Federal Courthouse built by the General Contractor, Clark Construction. Also contracted by HOK to perform the same duties with the Pinellas Criminal Court expansion project being constructed by Clark Construction. Contracted by the Veterans Administration to evaluate claims on facility at St. Pete, Florida. Investigated change order process to establish and evaluate the cause and effect by analyzing lost productivity, project delays, acceleration, labor and or material escalation and deviations or series of deviations from the baseline to the actual work. 

 

CRSS/KELSEY/HARDIN          1993 - 1995

ORANGE COUNTY CONVENTION CENTER, Orlando, FL

Scheduling Coordinator

•Handled Cost and Scheduling functions and oversaw trade contractors during the construction of Phases III and IV of the Orange County Convention Center, a $400M project.

•Utilized Primavera 2.3b.

•Scheduling duties (see above section; Cost and Scheduling Experience and Duties).

 

FLORIDA POWER under contract with C.D.I. Technical Services 1991 - 1992

Cost & Scheduling Coordinator - Turner & Suwannee River Fossil Fuel Power Plants

•Required planned maintenance shut-downs with approximately six shut-downs at $800,000 per shut-down. 

•Involved in the development and maintenance of computerized schedules, detail and summary level activities, activity sequencing and manpower allocation.

•Incorporated procurement and fabrication activities along with other project milestones or time constraints into an integrated master plan. Performed cost and schedule analysis and generated reports.

•Coordinated manpower utilization on the job. 

•Conducted daily scheduled meetings with supervisors and project management.  

•Utilized Artemis software.

 

FLORIDA POWER under contract with Power Plant Maintenance Inc., Society Hill, SC  1991

Cost & Scheduling Coordinator - Indiantown Plant

•Required planned maintenance shut-down at a cost of $1.5 million. 

•Developed and maintained computerized schedules, detail and summary level activities, activity sequencing and manpower allocation. 


THOMAS J. SMITH Page 5

____________________________________________________________________________________________________

 

PROFESSIONAL EXPERIENCE  (cont.)

 

FLORIDA POWER under contract with Power Plant Maintenance Inc. (cont.)

•Incorporated procurement and fabrication activities along with other project milestones or time constraints (design, redesign, field or office change orders) into an integrated Master Plan.  Maintained daily interface with field and management personnel. 

•Performed schedule analysis and prepared reports on project status. 

•Conducted daily scheduling meetings with supervisors, project management and subcontractors to determine daily work schedule preparation and provide direction to project team. 

•Utilized Primavera software. 2.1

 

WESTINGHOUSE under contract with Peak Technical Services, Aiken, SC   1990 - 1991

Senior Scheduling Coordinator - Savannah River Nuclear Site

•Involved in tritium facility construction, $250M. 

•Developed and maintained computerized construction schedules, detail and summary level activities, activity sequencing and manpower allocation. 

•Communicated daily with field and management personnel, as well as interacting with subcontractors and other in-house divisions. 

•Performed cost and schedule analysis and generated reports on project status. 

•Coordinated manpower utilization on the job. Prepared daily, weekly, and summary reports with graphics. 

•Conducted daily scheduling meetings with supervisors, project leaders and foremen to determine time or labor constraints and provide direction and guidance to project teams. 

•Utilized Primavera and Finest House software.P3 version2.0b.

 

LANDMARK CONSTRUCTION MANAGEMENT COMPANY, St. Louis, MO/Orlando, FL 1988 - 1990

Project Scheduling Coordinator 

•Involved in the construction of Universal Studios Florida. Oversaw five general contractors in the development and integration of schedules into a Master Plan, $250M.

•In charge of reviewing and analyzing monthly updates from each general contractor to ensure their portion of the project was adhering to the project baseline schedule. Reported directly to Universal Studios upper management team on month-to-month progress.

•Reviewed and analyzed weekly and monthly reports and communicated with representatives of Universal Studios Florida. 

•Utilized Primavera 1.0 as the software of choice for the master plan.

 

CAMP, DRESSER & McKEE, INC., Maitland, FL 1984 - 1988

Construction Management Systems Engineer

•Employed by an environmental design, engineering and construction management company on a broad range of projects, including: 

-Alafaya Wastewater Treatment Facility - $100M.

-RIBS (Rapid Infiltration Basin System) of West Orange County - $50M.

-Sand Lake Road Wastewater Treatment Expansion.

•Oversaw the General Contractor’s schedule during the design and construction phases of wastewater treatment plants located in Orange, Seminole and Osceola Counties in Central Florida. 

•Oversaw general contractors, as well as the development and maintenance of computerized schedules. 

•Organized weekly interface meetings with contractors, subcontractors, project management and county officials for reporting of project status. 

•Reviewed and analyzed contractors’ progress and provided direction and guidance to the project team. 

•Developed in-house design and engineering schedules and bid proposal schedules for marketing team proposed future work. 

•Utilized Primavera software.P3 version1.0.

 

FLUOR ENGINEERS & CONSTRUCTORS, INC., Irvine, CA/Jubail, Saudi Arabia 1981 - 1983

Project Planning & Control

•Involved in $13.5 billion dollar project that included a Petrochemical Complex in Jubail, Saudi Arabia and the Northwest Alaskan Pipeline. 

•Responsible for the development of manually generated, 5,000 activity CPM schedule for the office and utility complex in the petrochemical plant. 

 

THOMAS J. SMITH Page 6

____________________________________________________________________________________________________

 

PROFESSIONAL EXPERIENCE  (cont.)

 

FLUOR ENGINEERS & CONSTRUCTORS, INC. (cont.)

•Manually performed all scheduling using only drafting tools (computers were not available at that time). Utilized I-J scheduling methodology

•Incorporated construction, procurement, and field or shop fabricated activities into an integrated baseline Master Plan. 

          Coordinated progress walk-throughs with each area superintendent for each discipline in my construction area.

•Performed the analysis and manual preparation of reports on project status.

•Conducted daily meetings with supervisors and prepared estimated completion summaries based  on daily walk-throughs of the project.

•Input all change orders manually into an I-J driven CPM.

•Gained proficiency in building fragnets and handling claim preparation during the construction process.

 

EDUCATION

 

UNIVERSITY OF FLORIDA, School of Building Construction, Gainesville, FL

Bachelor of Building Construction, 1980

 

VALENCIA COMMUNITY COLLEGE, Orlando, FL

Associate of Arts - General Education, 1976

THOMAS J. SMITH

___________________________________________________________________________________________________

 

6935 Hundred Acre Drive       •       Cocoa, Florida 32927       •      407-730-0373      •        growlingator70@yahoo.com

 

 

PROFILEHighly qualified professional offers over 30+ years of comprehensive experience in the Construction Industry with a proven track record of success in the areas of:

 

    Project Management  ♦  Project Control / Cost & Scheduling

 

Career encompasses involvement in various industries, including:

 

-Airport Construction 2 years

- Theme Parks Construction                     5 years

- Petrochemical / Grass Root Plant Construction 3 years

- Commercial Construction                         20+ years

- Environmental - Waste Water Plant/Pipelines   3.5 years

- Nuclear - U/G Tritium Facility     1.5 years

- Fossil Fuel/Power Plant - Plant Shutdowns 2 years

-Prior to college - Obtained hands-on experience as a Plumber's Helper, Steelbuilding Erector (Butler and Star-type buildings) and as a Rodbuster with a concrete company for over 10 years.

 

Cost and Scheduling Experience & Duties include:

 

•Project control experience with Primavera P3 and P6. Importation of Microsoft Project schedules into Primavera schedules. Army Corp of Engineers SDEF (Standard Data Exchange Format).

•Assist Marketing, Estimating, and Project team leaders in the development of Proposal and Bid schedules.

•Function as a team leader throughout the plan and schedule development process, including the Design, Submittal, Procurement and comprehensive Construction Schedule.

•Develop and implement the WBS, work item lists and their logic including major project milestones and constraints between work items to determine the project Master Schedule.

•Implement cost and manpower resource loading development.

•Perform daily and weekly progress field walks to verify subcontractors are working on critical path construction activities and maintaining all other contractual baseline work.

•Develop customized field reports designed to facilitate field progress reporting. 

•Prepare 2-week look-ahead with customized column information for superintendents or assistant superintendents, responsible for determining their specific areas of field progress.

•Conduct P3 and P6 in-house training for all superintendents and project managers.

•Manage issues related to change of scope and documenting any specific deviation or series of deviations from the baseline schedule.

•Creation of Fragnets to represent any work slippages and time impact delays for future claim determinations on a month to month basis or at contracted updating periods.

•Physically input progress (start and finish dates, percent completions and remaining durations) on a monthly basis.

•Calculate Earned Value progress.

•Compare updated progress schedule to baseline schedule for time-scaled logic problems which may cause total float changes and project slippage.

•Review and analyze the results of status input and changes due to scope related changes and additions issued during the reporting period.

•Prepare tabular schedule reports outlining early and late dates and total float; cost and manpower histograms and s-curves.

•Provide an executive analysis and monthly narrative outlining the project performance vs. the baseline

schedule.

•Attend and support daily subcontractor meetings.

•Conduct weekly scheduling meetings with all project subcontractors and vendors for project compliance.

•Performed forensic scheduling methodology; development of as-built schedules; investigated change order process to establish and evaluate the cause and effect by analyzing lost productivity, project delays, acceleration, labor and or material escalation and deviations or series of deviations from the baseline to the actual work.

 


THOMAS J. SMITH Page 2

 

___________________________________________________________________________________________________

 

PROFESSIONAL EXPERIENCE

 

COST MANAGEMENT INC. (CMI), Orlando, FL  09/2014 – 12/2015

Master Scheduler – MBE Contract Consultant work - expired

•Created an integrated Master Schedule that incorporated multiple Construction Manager (CM) team schedules for the Greater Orlando Aviation Authority (GOAA) on the $1.9B South APM complex.

•Built the entire Master Program for this 3-year project using the 8.3.2 version of Primavera P6.

•Coordinated interproject relationships between the CM’s common work.

•Developed and maintained all project milestones and contractual obligations of the CM teams.

          Oversaw the development of the Hensel Phelps and Turner-Keiwit Joint Venture (JV) schedules. This included an Intermodal Transfer Facility (ITF), a 6-story, 2,400-space Parking Garage, the APM, and a PDL(Porte-Cochere).

          Also created a Master Schedule for the North Terminal for various  renovation and new construction projects.

 

TURNER CONSTRUCTION COMPANY, Orlando, FL   03/2013 – 02/2014

Senior Project Scheduler

 

Four Season Hotel / Convention Center – Disney property – 3 /2013 thru 2/2014

•Initially responsible for managing scheduling activities for a $300M Four Seasons/Convention Center project.

•Converted an existing Primavera P3 schedule to a P6 schedule utilizing a WBS format.

•Collected data and analyzed project information to support project schedules.

          Provided ongoing management of CPM project schedules, including baseline analysis and acceptance.

          Responsible for change orders and the analysis of delay claims or time extensions.

•Performed a comprehensive analysis of critical activities.

Citus Bowl – Renovation 2/2014 thru 9/2014

•Created and managed scheduling activities for the $300M, 10-month long Fast Track Florida Citrus Bowl renovation project, from demolition through complete rebuild.

•Created and maintained the baseline schedule with a WBS, in addition to providing ongoing analysis and support of critical activities while functioning under tight time constraints.

 

COST MANAGEMENT INC. (CMI), Orlando, FL  2011 - 2012

Project Manager - Orange County District Wide Operations/Portable Installations-MBE Consultant contract expired

•Developed and wrote all work scopes for each project assignment.

•Developed Bid List and invited subcontractor participation on bid projects.

•Walked contractors through project scope.

          Evaluated each bid to ensure compliance with project specifications.

          Awarded contracts to lowest bidder.

•Supervised and monitored each project throughout all phases of construction.

•Closed out each project and prepared final payment to contractor.

•Utilized Primavera P6.

 

BALFOUR BEATTY CONSTRUCTION, Orlando, FL                                                                      2006 - 2011

Senior Project Planner Scheduler

•Peabody Hotel and Convention Center expansion; GMP of $260M. 

•Handled scheduling duties for Midtown phases 2 and 4 in Downtown Miami; GMP of each phase was $250M. 

•Recorded and managed subcontractor work delays and stoppages on a monthly basis and input as fragnets, including all change orders.

•Scheduling duties (see above section; Cost and Scheduling Experience and Duties).

•Utilized Primavera P6 vers. 6.0 and 6.1.

 

SPACE GATEWAY SUPPORT, Kennedy Space Center, FL2005 - 2006

Project Manager - Hurricane Recovery Team 

•Managed and resolved all issues pertaining to hurricane and weather-related issues and mitigated Cape Kennedy facilities to ensure optimum operational readiness.

•Developed and wrote all work scopes for each project assignment.

•Compiled Bid List and invited subcontractor participation on bid projects.

•Informed contractors of project scope.

          Evaluated each bid for project compliance.

          Awarded projects to lowest bidder.

•Supervised and monitored each project during construction.

•Closed out each project and prepared final payment to contractor.

 

THOMAS J. SMITH Page 3

___________________________________________________________________________________________________

 

 

PROFESSIONAL EXPERIENCE  (cont.)

 

SELF EMPLOYED, Orlando, FL                     2004 - 2005

Consultant

•Provided consulting services to various companies on project planning and scheduling, including Addison Steel Erectors, Orlando, Florida; and Nash Plumbing, Lake County, Florida.

•Utilized Primavera P3.

.

ALPHA CORPORATION, Dulles, VA2002 - 2003

Consultant for S.B. Ballard Construction, Virginia Beach, VA

•Provided planning and scheduling services on a wide range of projects, including:

-Kings Fork High School, Suffolk, Virginia - $75M.

-Aerial Delivery (parachute training facility for Army Corps of Engineers) - $40M.

-Baltimore Aquarium - Performed claims analysis throughout project construction.

-St. Mary’s Disabled Children's Hospital.

-Christopher Newport University Parking Garage - $25M.

-Jacksonville Public Library - $35M.

-Jacksonville Public Parking Garage - $30M.

-Langley Operations Center - $30M.

-Richmond 14th Street Parking Garage - $30M.

-Virginia Beach Convention Center (pilecaps and foundations) - $28M.

-University of Virginia Arena and Parking Garage - Prepared proposal schedules.

-Norfolk Airport Parking Garage - Prepared proposal schedules.

•Ballard collected over $350,000 in a claim that was caused by worked stoppages and provided documentation that these work stoppages were not caused by Ballard work forces. Instrumental in developing Fragnets that verified Ballard's work performance and incorporated time impact analysis methods to illustrate the delays that were caused by the Owners’ subcontractors.

•Scheduling duties (see above section; Cost and Scheduling Experience and Duties).

 

SUITT CONSTRUCTION, Orlando, FL 1999 - 2001

OPRYLAND HOTEL / CONVENTION CENTER

Senior Scheduler

•Performed all cost and scheduling functions for $350M project that was approx. 1,000,000 sq. ft.

•Developed and maintained a baseline schedule with 7,500 activities. Interfaced with project managers and superintendents to develop the phasing and sequencing of the project. 

•Utilized Primavera 3.0 to incorporate Procurement and Fabrication activities, along with preparing a Comprehensive Construction schedule.

•Performed punch-out of the Hotel/Convention Center, taking photos for scheduling and tracking purposes, in addition to recording video for operations and maintenance.

•Scheduling duties (see above section; Cost and Scheduling Experience and Duties).

 

CLARK CONSTRUCTION, Tampa, FL1998 - 1999

COLEMAN FEDERAL PRISON - approx. $100 million expansion project

Senior Scheduler

•Utilized Primavera 2.0b to maintain a resource/cost loaded schedule that included approx. 5,000 activities.

•The project was a Federal job that required very strict scheduling specifications for approval of the baseline schedule.  Following the schedule’s approval by the Federal Review Board of Prisons in Washington, D.C., the reporting was performed on a monthly basis for ongoing review by the Federal Prison Board in Washington D.C. Monthly submissions of the approved AIA pay application were delivered by the project team to the agency in Washington, D.C. This included cost and manpower graphs and supplemental reports (S-Curves and Bell Curves).

•Utilized all forensic scheduling methodology to mitigate change orders caused by work stoppages on a monthly basis.

•Interfaced daily with superintendents and project managers on the progress of each activity. 

•Met every two weeks with the Bureau’s field managers with a 6-week look-ahead (2 weeks back and 4 weeks forward) for review of field progress. Also prepared a monthly narrative with the monthly update package.

•Scheduling duties (see above section; Cost and Scheduling Experience and Duties).

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Master Scheduler

CMI Management Inc

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

More than 15 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Inactive Clearance

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Master Scheduler

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time
Per Diem

 

Target Company:

Company Size:

Occupation:

Other

·         Other

Logistics/Transportation

·         General/Other: Logistics/Transportation

Project/Program Management

·         General/Other: Project/Program Management

·         Program Management

 

Target Locations:

Selected Locations:

US-FL-Melbourne

Relocate:

Yes

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Fluent