THOMAS J. SMITH ___________________________________________________________________________________________________ 6935 Hundred Acre
Drive • Cocoa,
Florida 32927 •
407-730-0373 •
growlingator70@yahoo.com PROFILEHighly qualified professional offers over 30+ years
of comprehensive experience in the Construction Industry with a
proven track record of success in the areas of: Project
Management ♦ Project Control / Cost & Scheduling Career encompasses involvement in various
industries, including: -Airport Construction 2 years - Theme Parks
Construction
5 years - Petrochemical / Grass Root Plant
Construction 3 years - Commercial
Construction
20+ years - Environmental - Waste Water
Plant/Pipelines 3.5 years - Nuclear - U/G Tritium Facility
1.5 years - Fossil Fuel/Power Plant - Plant
Shutdowns 2 years -Prior to college - Obtained
hands-on experience as a Plumber's Helper, Steelbuilding Erector (Butler and
Star-type buildings) and as a Rodbuster with a concrete company for over 10
years. Cost and Scheduling Experience & Duties include: •Project control experience with
Primavera P3 and P6. Importation of Microsoft Project schedules into
Primavera schedules. Army Corp of Engineers SDEF (Standard Data Exchange
Format). •Assist Marketing, Estimating, and
Project team leaders in the development of Proposal and Bid schedules. •Function as a team leader
throughout the plan and schedule development process, including the Design,
Submittal, Procurement and comprehensive Construction Schedule. •Develop and implement the WBS, work
item lists and their logic including major project milestones and constraints
between work items to determine the project Master Schedule. •Implement cost and manpower
resource loading development. •Perform daily and weekly progress
field walks to verify subcontractors are working on critical path
construction activities and maintaining all other contractual baseline work. •Develop customized field reports
designed to facilitate field progress reporting. •Prepare 2-week look-ahead with
customized column information for superintendents or assistant
superintendents, responsible for determining their specific areas of field progress.
•Conduct P3 and P6 in-house training
for all superintendents and project managers. •Manage issues related to change of
scope and documenting any specific deviation or series of deviations from the
baseline schedule. •Creation of Fragnets to represent
any work slippages and time impact delays for future claim determinations on
a month to month basis or at contracted updating periods. •Physically input progress (start
and finish dates, percent completions and remaining durations) on a monthly
basis. •Calculate Earned Value progress. •Compare updated progress schedule
to baseline schedule for time-scaled logic problems which may cause total
float changes and project slippage. •Review and analyze the results of
status input and changes due to scope related changes and additions issued
during the reporting period. •Prepare tabular schedule reports
outlining early and late dates and total float; cost and manpower histograms
and s-curves. •Provide an executive analysis and
monthly narrative outlining the project performance vs. the baseline schedule. •Attend and support daily
subcontractor meetings. •Conduct weekly scheduling meetings
with all project subcontractors and vendors for project compliance. •Performed forensic scheduling
methodology; development of as-built schedules; investigated change order
process to establish and evaluate the cause and effect by analyzing lost
productivity, project delays, acceleration, labor and or material escalation and
deviations or series of deviations from the baseline to the actual work. THOMAS J. SMITH Page
2 ___________________________________________________________________________________________________ PROFESSIONAL EXPERIENCE COST MANAGEMENT INC. (CMI), Orlando, FL 09/2014 – 12/2015 Master Scheduler – MBE Contract Consultant work - expired •Created an integrated Master
Schedule that incorporated multiple Construction Manager (CM) team schedules
for the Greater Orlando Aviation Authority (GOAA) on the $1.9B South APM
complex. •Built the entire Master Program for
this 3-year project using the 8.3.2 version of Primavera P6. •Coordinated interproject
relationships between the CM’s common work. •Developed and maintained all
project milestones and contractual obligations of the CM teams. •
Oversaw the development of the Hensel
Phelps and Turner-Keiwit Joint Venture (JV) schedules. This included an
Intermodal Transfer Facility (ITF), a 6-story, 2,400-space Parking Garage,
the APM, and a PDL(Porte-Cochere). •
Also created a Master Schedule for the
North Terminal for various renovation and new construction projects. TURNER CONSTRUCTION COMPANY, Orlando, FL 03/2013 – 02/2014 Senior Project Scheduler Four Season Hotel / Convention Center – Disney
property – 3 /2013 thru 2/2014 •Initially responsible for managing
scheduling activities for a $300M Four Seasons/Convention Center project. •Converted an existing Primavera P3
schedule to a P6 schedule utilizing a WBS format. •Collected data and analyzed project
information to support project schedules. •
Provided ongoing management of CPM
project schedules, including baseline analysis and acceptance. •
Responsible for change orders and the
analysis of delay claims or time extensions. •Performed a comprehensive analysis
of critical activities. Citus Bowl – Renovation 2/2014
thru 9/2014 •Created and managed scheduling
activities for the $300M, 10-month long Fast Track Florida Citrus Bowl
renovation project, from demolition through complete rebuild. •Created and maintained the baseline
schedule with a WBS, in addition to providing ongoing analysis and support of
critical activities while functioning under tight time constraints. COST MANAGEMENT INC. (CMI), Orlando, FL 2011 - 2012 Project Manager - Orange County District Wide Operations/Portable
Installations-MBE Consultant contract expired •Developed and wrote all work scopes
for each project assignment. •Developed Bid List and invited
subcontractor participation on bid projects. •Walked contractors through project
scope. •
Evaluated each bid to ensure compliance
with project specifications. •
Awarded contracts to lowest bidder. •Supervised and monitored each
project throughout all phases of construction. •Closed out each project and
prepared final payment to contractor. •Utilized Primavera P6. BALFOUR BEATTY CONSTRUCTION, Orlando,
FL
2006 - 2011 Senior Project Planner Scheduler •Peabody Hotel and Convention Center
expansion; GMP of $260M. •Handled scheduling duties for
Midtown phases 2 and 4 in Downtown Miami; GMP of each phase was $250M. •Recorded and managed subcontractor
work delays and stoppages on a monthly basis and input as fragnets, including
all change orders. •Scheduling duties (see above
section; Cost and Scheduling Experience and Duties). •Utilized Primavera P6 vers. 6.0 and
6.1. SPACE GATEWAY SUPPORT, Kennedy Space Center, FL2005
- 2006 Project Manager - Hurricane Recovery Team •Managed and resolved all issues
pertaining to hurricane and weather-related issues and mitigated Cape Kennedy
facilities to ensure optimum operational readiness. •Developed and wrote all work scopes
for each project assignment. •Compiled Bid List and invited
subcontractor participation on bid projects. •Informed contractors of project
scope. •
Evaluated each bid for project
compliance. •
Awarded projects to lowest bidder. •Supervised and monitored each
project during construction. •Closed out each project and
prepared final payment to contractor. THOMAS J. SMITH Page
3 ___________________________________________________________________________________________________ PROFESSIONAL EXPERIENCE (cont.) SELF EMPLOYED, Orlando, FL
2004 - 2005 Consultant
•Provided consulting services to
various companies on project planning and scheduling, including Addison Steel
Erectors, Orlando, Florida; and Nash Plumbing, Lake County, Florida. •Utilized Primavera P3. . ALPHA CORPORATION, Dulles, VA2002
- 2003 Consultant for S.B. Ballard Construction, Virginia Beach, VA •Provided planning and scheduling
services on a wide range of projects, including: -Kings Fork High School, Suffolk,
Virginia - $75M. -Aerial Delivery (parachute training
facility for Army Corps of Engineers) - $40M. -Baltimore Aquarium - Performed
claims analysis throughout project construction. -St. Mary’s Disabled Children's
Hospital. -Christopher Newport University
Parking Garage - $25M. -Jacksonville Public Library - $35M. -Jacksonville Public Parking Garage
- $30M. -Langley Operations Center - $30M. -Richmond 14th Street
Parking Garage - $30M. -Virginia Beach Convention Center
(pilecaps and foundations) - $28M. -University of Virginia Arena and
Parking Garage - Prepared proposal schedules. -Norfolk Airport Parking Garage -
Prepared proposal schedules. •Ballard collected over $350,000 in
a claim that was caused by worked stoppages and provided documentation that
these work stoppages were not caused by Ballard work forces. Instrumental in
developing Fragnets that verified Ballard's work performance and incorporated
time impact analysis methods to illustrate the delays that were caused by the
Owners’ subcontractors. •Scheduling duties (see above
section; Cost and Scheduling Experience and Duties). SUITT CONSTRUCTION, Orlando, FL 1999 - 2001 OPRYLAND HOTEL / CONVENTION CENTER Senior Scheduler •Performed all cost and scheduling
functions for $350M project that was approx. 1,000,000 sq. ft. •Developed and maintained a baseline
schedule with 7,500 activities. Interfaced with project managers and
superintendents to develop the phasing and sequencing of the project. •Utilized Primavera 3.0 to
incorporate Procurement and Fabrication activities, along with preparing a
Comprehensive Construction schedule. •Performed punch-out of the
Hotel/Convention Center, taking photos for scheduling and tracking purposes,
in addition to recording video for operations and maintenance. •Scheduling duties (see above
section; Cost and Scheduling Experience and Duties). CLARK CONSTRUCTION, Tampa, FL1998
- 1999 COLEMAN FEDERAL PRISON - approx. $100 million expansion project Senior Scheduler •Utilized Primavera 2.0b to maintain
a resource/cost loaded schedule that included approx. 5,000 activities. •The project was a Federal job that
required very strict scheduling specifications for approval of the baseline
schedule. Following the schedule’s approval by the Federal Review Board
of Prisons in Washington, D.C., the reporting was performed on a monthly
basis for ongoing review by the Federal Prison Board in Washington D.C.
Monthly submissions of the approved AIA pay application were delivered by the
project team to the agency in Washington, D.C. This included cost and manpower
graphs and supplemental reports (S-Curves and Bell Curves). •Utilized all forensic scheduling
methodology to mitigate change orders caused by work stoppages on a monthly
basis. •Interfaced daily with
superintendents and project managers on the progress of each activity. •Met every two weeks with the
Bureau’s field managers with a 6-week look-ahead (2 weeks back and 4 weeks
forward) for review of field progress. Also prepared a monthly narrative with
the monthly update package. •Scheduling duties (see above
section; Cost and Scheduling Experience and Duties). |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|